Construction Phase I

Helium Tank with Vent Line

Vacuum Shell

GFRP Suspension Cone

Electronics for Temperature Sensors

Helium Tank attached to GFRP Cone

Radiation Shield wrapped in MLI

Burst Disc of Helium Tank

Tank Bottom with Burst Disc

Tank Bottom with Multi-Layer-Insulation

Vapor-cooled Stray Light Baffle

Stray Light Baffle wrapped in MLI mounted on GFRP Tubes

Optics Sensor and Motor Cabling

wrapped in plenty of MLI (Multi Layer Insulation)

ready for closure ...

the final touch ...
Construction Phase II

HRS Grating

Spectrometer Top Plate

Deflection Mirror

Telescope with Deflection Mirror

Alignment of Deflection Mirror

Telescope and Twinspectrometer

Grating Drive

Detector Unit

Optics before Integration

Thermal Connection of Detector Unit

Optics before Integration

integrated Optics

Internal Cabling

Stray Light Baffle

Integration of ZnSe Window
Test Phase

Electronics Test

Vibration Test in Berlin

accurate weight determination

Cryo Setup

EMC Test in Bonn

Pressure Relief Valve at Vent Line

Installation of Outer Thermal Insulation

Cryo Servicing before the First Test Flight

Russian Custom Work before Integration in Geophysica

CRISTA-NF on Dolly before Integration in Geophysica

CRISTA-NF in Geophysica Bay 2

Helium Servicing

ZnSe Window after integration in Geophysica

Final Testing

Final Inspection before Test Flight
First Flights on board Geophysica

Geophysica Arrival in Oberpfaffenhofen

Integrated System Test before Maiden Flight

Part of CRISTA-NF-Team before Test Flight

Oleg, the pilot

Geophysica and CRISTA-NF take off

Hot Wheels are cooled by the Fire Brigade

Final Preparation for Flight to Australia

Cryo Servicing in Thailand

Preparation for the next leg

Russian looks for Avionics

Geophysica in Darwin (Australia)

Science office at RAAF

Aktivities in RAAF Hangar

SCOUT-O3-Team after Final Flight

Nighttime Preparation for Return Flight
AMMA-Campaign in Ouagadougou (Burkina Faso) in August 2006

West African Monsoon in Ouagadougou

Biomass Burning in the Capital

GLOBAL CHANGE Bureau in Burkina Faso

Hardware Delivery from FZ Juelich

Multi-Cultural Encounters after Opening Ceremony

View of Hangar at Airport

New Valve Assembly for CRISTA-NF

Cryo Servicing in Hangar

Night Shift under aggravating circumstances

Geophysica has landed

Extinguishing Water for Brake Cooling

No Kerosene, No Flight

Another attempt ...

... without a step ladder ...

...to climp to new highs!
RECONCILE Campaign from January till March 2010 in Kiruna (Northern Sweden) Part 1

the day before Christmas: Container transportation to Kiruna

Arena Arctica: work place for 3 months

CRISTA-NF cooling: 3 days of waiting for -260 degrees

Black body calibration

Waiting for data

Arrival of the Geophysica

Ready for deployment

The Russian way of integration

almost ready for flight

Integration of the aircraft fairing ...

... with the friendly assistance from Wuppertal

leaving just the exhaust gas line

CRISTA-NF Team 2010

Polar Stratospheric Clouds (PSCs)

Polar Stratospheric Clouds (PSCs)