The ZEBIS-Rack

Rack in assembling

Modul 2 inside the Rack

Rack view from the right

Final assembly by Hans-Peter Heuser

Final assembly by Marc Krebsbach

Final assembly by Peter Knieling

Installation of a module

Installed modules (view from the right)

Rack after final assembly
Test phase in the frame of the COPS/TRACKS field campaign with basis in Friedrichshafen

Working environment

Meteo boom

ZEBIS-Rack after the certification

Backbord-view of Zeppelin NT

Backbord-Rotor

ZEBIS-Rack shortly before installation

Montage of the Rack ground attachment

Integration of the ZEBIS-Rack into the gondola

Without words!

Marc Krebsbach preparing the modules

Prepared modules

Module connection inside the rack

View from outside: ZEBIS-Rack inside the gondola

Inside view: ZEBIS-Rack inside the gondola

Inlet tubing of ZEBIS

Roll-out of the Zeppelin NT (1)

Roll-out of the Zeppelin NT (2)

Roll-out of the Zeppelin NT (3)

Mast-Truck

Reflection (1)

Reflection (2)

Take-off of the Zeppelin NT (1)

Take-off of the Zeppelin NT (2)

Take-off of the Zeppelin NT (3)

Intermediate landing (1)

Intermediate landing (2)

DIMONA (1)

DIMONA (2)

View into the gondola (1)

View into the gondola (2)
COPS/TRACKS field campaign with basis at Baden-Airpark

Hans-Peter Heuser preparing the modules (1)

Hans-Peter Heuser preparing the modules (2)

Hans-Peter Heuser preparing the modules (3)

Ralf Koppmann checking the Rack

View from the Cockpit

Positioning of the Zeppelin NT

Peter Knieling and Hans-Peter Heuser installating the modules

Hans-Peter Heuser fixates the front plates

Hans-Peter Heuser in front of the Zeppelin NT

View to the gondola

Fly-by-wire technology

Rear rotors

Zeppelin NT at the Mast-Truck (1)

Zeppelin NT at the Mast-Truck (2)

Zeppelin NT at the Mast-Truck (3)

Ultralight plane (1)

Ultralight plane (2)

Ultralight plane (3)

Ultralight plane (4)

Zeppelin NT preparing for take-off

Take-off of the Zeppelin NT
VERDRILLT campaign with base at INTA (Alcala de Henares, near Madrid, Spain)

CASA 212 AR (1)

CASA 212 AR (2)

CASA 212 AR (3)

CASA 212 AR (4)

View from the stern into the cabin of the CASA 212 AR

CBIS rack before installation

CBIS on the rack space in the CASA (1)

CBIS on the rack space in the CASA (2)

CBIS on the rack space in the CASA (3)

CBIS on the rack space in the CASA (4)

without words

Dusk

Campaign participants

Flight Impressions (1)

Flight Impressions (2)

Flight Impressions (3)

Flight Impressions (4)

Flight Impressions (5)

Flight Impressions (6)

Flight Impressions (7)

Flight Impressions (8)

Flight Impressions (9)

Flight Impressions (10)

Flight Impressions (11)

Flight Impressions (12)

Flight Impressions (13)

Flight Impressions (14)

Flight Impressions (15)

Flight Impressions (16)

Flight Impressions (17)

Flight Impressions (18)

Flight Impressions (19)

Flight Impressions (20)

Flight Impressions (21)

Flight Impressions (22)

Flight Impressions (23)
<back